Project for water Control and Management of the Shabelle River of Somalia, Volume 3A - The Afgoi-Mordine irrigation project feasibility study technical annex

Undefined
Other
Title Language: 
English
Language: 
English
Physical Location: 
SWALIM reference library
Abstract: 
Early in 1966 the Government of the Somali Republic requested United Nations Special Fund assistance in making feasibility studies of a controlled irrigation scheme and a flood irrigation scheme in the Shebelli Valley and in developing a plan for management of the Shebelli River waters. This request resulted from the recommendation of the 1961 -66 Special Fund Project - Somalia, Agricultural and Water Surveys - that such feasibility studies be undertaken. In response to the Government's request the United Nations Development Programme (1) authorised in June 1966 a project entitled andrdquoWater Control and Management of the Shebelli River, Somaliaandrdquo. The project was assigned to the Food and Agriculture Organisation of the United Nations as the Executing Agency. The Plan of Operation was signed in September 1967 and this Agency contracted with Hunting Technical Services Ltd. of U. K. to carry out the work for the project. The results of the project investigations are presented in three volumesVolume I - General Report, Volume II - Balad Flood Irrigation, ProjectFeasibility Report and Volume III - Afgoi-Mordille Controlled Irrigation Project, Feasibility Report. This is the technical annex to volume III
Shelf Locator: 
631.674.1 HTS
Access conditions: 
Date of publication: 
January, 1969
Agris Subject Categories: 
Extent: 
174p.
Form: 
Notes: 
11 app.,31 tables in text, 14 fig. in text, 9 plates, ref. , glossary
Source: